Environment Agency Waste Returns: Deadlines and How to Submit

By James Parry, head of product at TIPPA · Last reviewed

In short: if you run a permitted waste site in England, you must tell the Environment Agency how much waste you received and removed, on its Excel form (version 17.0). Most permits need a return each quarter, sent in the month after it ends. Late is a breach of your permit.

What a Waste Tonnage Return Is and Who Sends One

A waste tonnage return reports the waste you have received or removed from your site. Every environmental permit holder in England sends one to the Environment Agency (EA), which uses it to check permit conditions and collect national waste statistics.

Send one for every period until your permit is fully surrendered. No waste in or out? The form records a nil return for you.

When Are Environment Agency Waste Returns Due?

Your permit's reporting conditions say whether you report quarterly (four returns a year) or annually (one, for January to December). Most quarterly permits don't also need an annual return. Each period has a one-month submission window:

Period CoveredEA Submission Window
1 January to 31 March1 to 30 April
1 April to 30 June1 to 31 July
1 July to 30 September1 to 31 October
1 October to 31 December1 to 31 January
Annual: 1 January to 31 December1 to 31 January of the following year
Not in England? Who Takes Your Return, and When

The EA takes returns for sites in England only.

  • Wales: Natural Resources Wales, on its own template (one return per permit, more if it covers several operations), on the EA's dates. NRW offers a paper form on request if you can't email the spreadsheet.
  • Scotland: SEPA's waste data return, from every operator at registration or permit level, quarterly or annually on SEPA's Excel form, by 28 April, 28 July, 28 October and 28 January; an annual return by 28 January.
  • Northern Ireland: NIEA's Waste Summary Return spreadsheet, on the EA's end-of-month dates, but its quarter 1 is April to June.

What Happens If I Send My Waste Return Late?

Miss 23:59 on the last day and you're in breach of your permit. Lateness goes by when the EA receives your return, not when you filled it in, and its inbox isn't watched at weekends. Send early: the EA handles over 7,000 returns a quarter.

What to Include and What to Leave Out

Include the waste received and removed under your permit, from transfer and treatment, including interceptor or sealed drainage waste your process creates. Leave out:

  • waste you have not formally accepted
  • quarantined waste relocated to another site
  • other waste not produced by your permitted activities, such as canteen, office and car park interceptor waste, which follow the normal rules for business and hazardous waste

The waste tonnage return is not the hazardous waste consignee return, which goes to hazwastereturn@environment-agency.gov.uk. If you send one to the waste returns address, it will not be processed.

What Goes on the Form

The EA only accepts version 17.0, and the wrong one may breach your permit. You report totals for the period, not loads, so combine lines when every field is identical; lines with blank or zero tonnage are ignored. The form has four pages:

  1. Site Information: your permit, site and a declaration. The permit number goes in capitals, with no spaces, brackets or "EPR" prefix.
  2. Waste Received: one line per type of waste, with its origin, EWC code, D or R code and tonnes (not kilograms).
  3. Waste Removed: the same for waste going out, with its destination.
  4. Technical Competence: your technically competent manager, even on a nil return.
Every Field, Page by Page

1. Site Information

The date, period, operator, permit number, site address and facility type, whether a weighbridge was used and the percentage weighed, and a declaration with your name, position, phone and email. Enter the permit number in capitals, with no spaces, brackets or "EPR" prefix. Mobile plant gives the full address the permit was issued to.

2. Waste Received

One line per type of waste:

  • Origin: the local authority area it came from, from the form's list: the smallest area you can, or "Outside UK".
  • EWC code: six digits, no spaces, one your permit allows. Find one with our EWC code finder.
  • Disposal or recovery (D or R) code: what you do with it, exactly as listed. Yours are in Schedule 1 of your permit.
  • Municipal source and degradable (yes or no), and its state: solid, liquid, sludge, powder, gas or mixed.
  • From another activity: the type of facility it came from, "No facility", or an unknown option if you don't know which.
  • Amount in tonnes (not kilograms), and pre-treatment if it applies.

3. Waste Removed

Destination area, EWC code, municipal source, state, the D or R code for what the receiving facility will do with it, and tonnes.

4. Technical Competence

Your technically competent manager, which waste permits must give: "No TCM change since last return", "No scheme" (exempt facility types), "WAMITAB / CIWM" with each manager's name and date of birth, or "EU Skills / ESA" with the accreditation body and certificate number. Nil-return sites still complete this page.

How Do I Submit a Waste Tonnage Return?

  1. Download the waste tonnage return form and save it to your device.
  2. Complete it in Microsoft Excel (not Google Sheets or Apple Numbers) and save it in the original Excel format.
  3. Email it to national-operator-returns@environment-agency.gov.uk, with your permit number, quarter and year in the subject.

The form adds: no PDFs, images, ZIP files or file-sharing links, and no more than five returns per email. Can't use Excel? Ask the EA for another format on 03708 506 506.

Digital waste tracking doesn't replace your return yet: until further notice, send both.

Corrections and Resubmissions

Resubmissions, late returns and older periods all use version 17.0, which asks whether you're resubmitting, and why. The form's checks only confirm required fields are filled in: accuracy is yours.

When a Resubmission Counts as Late

The form's guidance:

  • If the EA rejects a return sent within the window, your resubmission counts as a new return. If that arrives after the window has closed, it is late and may face enforcement action.
  • If you amend a return (at the EA's request or your own) and the original arrived within the window, the first submission date stands.

Before You Submit: A Checklist

Eight Checks Before You Send It
  • Version 17.0 from GOV.UK, opened in Microsoft Excel.
  • The right quarter and year, and today's date as the completion date.
  • The permit number in capitals, with no spaces and no "EPR" prefix.
  • D and R codes picked from the list, not typed as a description.
  • Tonnes, not kilograms.
  • The technical competence page complete, even for a nil return.
  • No validation errors on the Site Information page, and the file saved on that page.
  • Sent early in the window, well before 23:59 on the last day.

Check the Official Guidance

Sources: The 8 Official Pages This Guide Is Based On

How TIPPA Helps

Record each load once, and TIPPA builds your return on the EA's own form and can email it for you.

TIPPA's Waste Return screen for Fernhallow Recycling, showing tonnes by EWC and disposal or recovery code before sending
Built from the loads you've recorded, checked before you send it.
  • Totals from your receipts and the waste going out.
  • Rejected and quarantined waste left out for you.
  • NRW's, SEPA's or NIEA's own return outside England.
  • A free dashboard reminder when a return is due.

Waste Returns add-on

Free for life. Pay only for the extras you choose.